Ok, very helpful to rewatch all of the material.
So I guess I’m asking are there ever times that the Designer has a contract with the Builder? Where the designer is working directly for the builder? Is that a whole other animal?
If the designer works directly for the builder would we charge the same way as if were were working for a client?
Thank you!